Angliaservices Engineering Ltd Links



Visitors to this site since July 2019



 

 








































































Welcome to the
Angliaservices Engineering Ltd Website


  on the 12th July 2020
This site is regularly updated. Please visit again.

PHILLIP HARVEY
(Operating as Angliaservices Engineering Ltd.)
A VAT Registered Limited Company

Based in the Saxmundham area of Suffolk. Phill has been operating as a Consultant Manager / Engineer
for 22 years and has been operating in the Electricity Supply Industry for 40
Availability: Immediate start

Bus. Mobile: +44 7954 129278         Tel: +44 7798 724689        e-mail: phill@angliaservices.com     UK National

Call for more information.      Click here to go to downloadable PDF version CV.

EDF Energy Nuclear Generation & Magnox - Project Manager/Engineer - Nuclear Safety Case

Dec 2011 to 3rd April 2014         EDF Energy Nuclear Generation, Sizewell B Power Station - Project Manager/Engineer             (CONTRACT)

Responsible for the delivery of the Generator Transformer Exchange Project at SZB, from initial conception, through to final delivery. (Gates 1 - 5). This major project that is being carried out during two refuelling outages (2014 & 2016) involves the replacement of two sets of three 23.5kV/400kV single phase ALSTOM transformers each weighing 160tonne, as well the supporting transformer oil cooling equipment. In addition to this, the unique configuration at SZB has resulted in the requirement to remove and replace the Siemens Gas Insulated Switchgear (GIS) that forms part of the structure and the electrical circuit of the 3 phase transformer(s).

During the initial planning of this complex project, I provided on site assistance at Torness Nuclear Power Station in SE Scotland for a period of five months in 2012, followed by supporting the Siemens GIS refurbishment of the SZB Station Transformer #5.
As sole Project Manager for the Transformer Exchange project I was deeply involved in all aspects and stages of the project ('cradle to grave') from the generation of all the documentation to initially specify the project to get budget approval all the way through to the development of the full implementation project plan. This project was a CDM notifiable scheme and we received notification from the HSE that they would be taking an active interest in this large project.

In addition to this large project, I began a scheme to provide an off-site storage facility that will deliver additional storage space for SZB and the proposed Sizewell C Nuclear Power Station (SZC). This involvement began with the search for a suitable property to purchase, then leading the initial design and configuration with the support of a small EDFE team. In November 2013 we began ground investigations and preparations for construction of the site. This project was on a tight timescale to be completed by late spring 2014 to provide temporary laydown for the 3 150 tonne Alstom Transformers . Following handover of the Transformer Project to an EDFE Project Manager in February 2014, I was requested to get involved in the Japanese Emergency Response (JER) Project. This temporary role involved progressing the design and implementation of the Penetration Sealing aspect of the JER Project, at SZB.

Previous Nuclear Career Experience

Aug 07 - April 08                      British Energy - Apprentice Training Technical Author, Sizewell B.
                      (CONTRACT)
Working under a short term contract for British Energy (Now EDF Energy Nuclear Generation) I was involved in the creation of technical training material for their apprentice & mature electrically biased student courses.
This project played an important part in British Energy's commitment to achieve world class status amongst the WANO agreement and to prepare for nuclear new build. The training material that I authored encompassed not only the technical aspects of the work but the safety culture that plays an important part of the nuclear business.
Achievement. At short notice delivered and lectured a course on the safe maintenance of batteries that I had authored to three groups of technicians as part of their Continuation Training package as well as providing technical expertise to several SZB site engineers.

Mar 06 - July 06                      RVA Consulting - Project Manager - Sizewell A P.S. Suffolk
                     (CONTRACT)
Provided consultant project management skills to RVA Consulting, on behalf of their client British Nuclear Group. Responsible for a project to create and manage a team, that would isolate & disconnect buildings, plant and systems for decommissioning and demolition of the Sizewell A Nuclear site.
Project included all aspects from team selection to creation of documentation applicable to this project e.g. Project Strategy, Safety Case, Work Methodology & Procedures and the creation of Method Statement guidelines ready to commence work in January 2007. Carried out the role of Designer in the C.D.M. process and the identification of hazards and risk assessment development, in the project planning.

Sept 05 - March 06                      British Energy - Safety Case & Technical Author, Sizewell B. P.S.                      (CONTRACT)
Working under contract for the Operations Department at SZB, I assisted in the total review of the Control Room Operational Documentation; including S.O.Is, work and alarm procedures, drawings and records, at Britain's only Nuclear Pressure Water Reactor (PWR).

May 04 - May 05                      BNFL Magnox - Decommissioning Safety Case Engineer, Bradwell P.S. Essex                      (CONTRACT)

The preparation and authoring of nuclear safety case documents in support of the decommissioning project at Bradwell Nuclear Power Station.
Responsible to the Projects Safety Case Officer and the Project Implementation Manager for this high profile Nuclear Safety Project involved in dismantling this nuclear establishment over the next 20 years.
Aspects of this work involved the planning for the safe and controlled disposal of hazardous & radiological waste in line with agreed procedures and disposal routes. Development of Safety Cases, for the construction of a new nuclear safe store and other new build projects. Aligning the Safety Case process with the requirements of a designer under C.D.M and advising both the client and the principle contractor of their legal requirements under this legislation. Achievements. In this role I was responsible for assisting and supporting the Safety Case Officer/Manager as well as deputising for him in his absences from the site. This role required willingness, drive and determination to ensure that the Decommissioning Safety Case as well as the overall decommissioning process was 'Deemed Fit for Purpose' and delivered to agreed targets.
As the Deputised Safety Case Manager I interfaced with the sites designated NII Inspector on a regular basis to ensure that Nuclear Compliance was adhered to across the current work as well as future works. This acted as step up in my career development by increasing my knowledge and demonstrating my ability to manage at this senior level.

Oct 03 - May 04                      BNFL Magnox - PassPort v9 Upgrade Nuclear Safety Case Engineer, Oldbury TTC & Magnox Sites                       (CONTRACT)
The preparation and authoring of nuclear safety case documents in support of the PassPort Replacement Programme. Responsible to the Project Safety Case Officer and the Project Implementation Manager, for this high profile Nuclear Safety Category 1 Project at O.T.C.C. and on other Magnox sites (Sizewell, Trawsfynydd & Bradwell).

Jan 03 - Aug 03                      BNFL Magnox Berkley Centre, Berkley Nuclear Powerstation, Gloucestershire                       (CONTRACT)
Carried out the safety case authoring of a number of CAT II & CAT III Nuclear Safety Papers, for planned plant modifications at Sizewell A Nuclear Power Station in Suffolk. Interfaced on a daily basis with the INSA Officers and others in the Nuclear Safety Group.

April 02 - Nov 02                      Consultant Project Engineer. Dungeness B Power Station, Kent                      (CONTRACT)
In the role of Project Engineer within the Material Enhancement Project Group I was responsible for the delivery of several 'cradle to grave' projects.
This also involved the authoring of Nuclear Safety Case Papers (Cat II & Cat III) associated with the organisation and implementation of these small and medium sized electro-mechanical projects incl. Q.A., Hazard & Risk Identification procedures.
Providing engineering technical advice to the on site as well as the Engineering Section, and acting as a designer under C.D.M.
Principle Projects: Main Control Room Refurbishment, Electrically controlled Oil-Feed Supply to CW Pumps & Start-Up Boiler Feed Pumps, Emergency Diesel Generator Temp Monitoring System replacement, CW Pumphouse Sump Pump Replacement system, Decommissioning & removal of the Instrument Compressed Air System (located in RCA).

>June 99 - Dec 01                      Consultant Project Engineer. Bradwell Power Station, Essex.                      (CONTRACT)
Authoring of Nuclear Safety Case Papers to CAT II Level on a wide range of electro-mechanical & civil modifications.
Provided electrical engineering technical advice to the E.C. & I section, of the site Engineering Dept. Designated as the Responsible System Engineer, for Essential Battery Systems & IPAT Testing. Carried out the role of an Authorised Person (AP), working on the station electrical and instrument systems.
Responsible for the organisation and implementation of small to medium electro-mechanical projects including project planning, supervision & organisation of staff /contractors, work specifications, monthly site safety audits, method statements and risk assessments. Carried out the testing of existing plant & equipment, as well as the test & commission of new installations.
Principle Projects: Reactor Temperature Monitoring Replacement System (Guard-line System) & Essential Supplies Battery Systems, Refurbishment of Restaurant Food Preparation Facility, Control & organisation of site-wide IPAT Test & Inspection.
Achievements. Authored in excess of 200 Nuclear Safety Papers as well as playing a significant role in reducing the outstanding backlog of N.I.I. Compliance Issue Documentation i.e. Completion of expired Safety Cases, Assigned Engineers Investigation Reports, Maintenance Schedule work, Post-Incident Report Actions, etc. Carried out lectures on Safe LV/MV Live Working Practices to over eighty staff.

May 98 - Nov 98                      Magnox Electric, Sizewell A. and Bradwell Nuclear Power Stations.                      (CONTRACT)
Maintenance of Transformers, Switchgear, Generators, Rotating Machinery, Emergency Lighting, DC Supplies, Essential System Batteries, Emergency Lighting and IPAT Testing. De-contamination of electrical equipment. Carried out the role of an Authorised Person EM & NR.

June 96 - Sep 96                      Electrical/Instrument Technician, Sizewell B. Power Station, Suffolk.                      (CONTRACT)

Testing, calibration and maintenance of electrical and electronic control systems including sensitive Guard-line equipment. Work carried out in C2 Radiological Controlled Areas & Main Control Room.



Other Information: -

Place of Birth: Shropshire, England.       British Passport, UK citizen.

Security Clearance: Counter Terrorist Check (CTC) Oct. 2013, Clearance to work on Nuclear Civil sites - Access to all areas incl. the Radiological Controlled Area, Main Control Room and to Guard-line Restricted Areas.

Personal: Single (Divorced), Clean driving licence.

References: -      Available on request.

Formal Education Qualifications: -

Jul.1994.     Postgraduate Diploma in Business Management. Trent University.

Jan.1994.     Postgraduate Certificate in Business Management. Trent University.

Jul.1992.      H.N.C. in Electrical and Electronic Engineering. B.Tec.

Jul.1990.      O.N.C. in Engineering (Electrical, Electronic & Mechanical.) B.Tec.

Click here for Qualifications

Technical Training: -
Category II (AVB) Nuclear Safety Case Authoring & Verification incl. Simple CAT I (Oldbury T.C. 1999 & Nov. 2003)   * Category III Nuclear Safety Case Authoring   * EDF Energy Nuclear Generation Safety Case AV3   * Electrical & Mechanical/Radiological  * Competent Person/Nominated Supervisor (EDF Energy & Magnox)  * Health & Safety Auditing  * HAZOP & Risk Assessment   * ALARP  * Radiological C2 & C3/4 Training   * Confined Space  * Construction, Design & Management (CDM)  * Ergonomics & Human Factors  * Waste Handling & Environmental Considerations   * Construction & Demolition Processes  * Quality Management  * EDF Energy Nuclear Generation Certified Level 3 Field Supervisor  * Project Management  * Resource Management & Scheduling   * Cable Jointing  * Electrical Plant Fitting  * HV/LV Switching  * Electrical Installation  * Cable Laying and Reinstatement  * Health & Safety,   * Electricity Regulations  * Instrument Calibration  * Powered Access Platforms  * First Aid including Artificial Respiration  * ECS Card.

Click here for EDF Training Record       Click here for Nuclear Authorisations that I have held.       Click here for Nuclear Safety Case & Authorisations that I have held.

Management Training in: -
Human Resources, Finance, Operations, Marketing, Organisational Environments, Business Development, Corporate Strategy & Business Re-Engineering,
EDF NGL Fleet Certified Instructor.
Currently preparing to take the APMP exam.

Computer Training: -
Microsoft Office Pro, Access & MS Project, Magnox/EDF Energy Work Control System (PassPort v9), Risk Databases and HTML Code Web Authoring

To advertise here use this link      to go to the Angliaservices Contact Page



Holiday Home rentals in the Languedoc Roussillon Region, South of France
Click on image for information.


Maison-Limoux Holiday Home in Limoux, Aude, France
Rental from £450p.w
Sleeps 8


Les Lauriers Holiday Home in Limoux


Maison-Soredè Holiday
Home near Argeles sur Mer

House hunting
in the Languedoc?

Click here
for accommodation & specially guided tour breaks.



Novels published by the Phill Harvey

Available to buy on Amazon Kindle by clicking on Book Cover image to find out more.






Click here to go to The River of Time Website